Saturday, August 2, 2014

Phase II (Upstairs)

With the first floor mostly done, we decided to address our upstairs area. With baby Parker coming in October, we wanted to take out this old, 2 previous owners used, dingy carpet and replace it with hardwood.

Hallway (with added benefit of dog pee)
Master Bedroom (With our dogs blanket) 
Master Bedroom Sitting Area
Master Bedroom Closet (My side, Lauren's side is overflowing!)
We decided on gunstock wide plank to match the current hardwood on the stairs and railings. Through a local small business, we got the hard wood in a single day and we couldn't be happier.

Master Bedroom Sitting Area
Master Bedroom Closet
Hallway (Opposite view from one with carpet) 
Of course with removing carpet and adding hardwood, the house echoes much more. We also realized that having hardwood on the main floor and bedroom was killing our feet. To fix that we got a 8x10 carpet off of wayfair.com (which really was shipped at 7'10"x9'x10').

Master Bedroom with new carpet
On top of the hardwood and new rug, Lauren finally picked out a ceiling fan  to replace our 1990 gold ceiling fan.

1990 Fantasticness 
A Touch of Modern
Hope this helps you finally tackle that "Honey-do-list"!